St. Patrick’s Day Parade Traffic Control Plan 

3/18/18 

Closing the below roadways starting at 8:30 AM – 2:00 PM 

Close river side lane of Front St. from Schuylkill to Cumberland 

Close river side lane of Front St. from Locust to Walnut 

Closing the below roadways starting at 10:00 AM – 2:00 PM 

Close 2nd St. from Market to Forster (Will remain closed until after parade 5:00 PM) 

Close State St. from 2nd to 3rd 

Close Schuylkill from Front to 3rd 

Close 3rd from Schuylkill to Division 

Close 4th from Division to Graham 

Close 3rd from Division to Graham 

Close Green St from Division to Schuylkill 

Closing the below roadways at 11:30 AM 

Close 2nd from Forster to Cumberland (Will reopen as soon as runners are clear of this section) 

Police officers will close Division between Green and 4th as needed 

Closing the below roadways at 1:00 PM – 5:00 PM 

Close 7th St. SB at Sate St 

Close State St. WB at 7th 

Close Walnut St. from 5th to 2nd 

Close North St. from 2nd to 3rd 

Traffic Engineering will be responsible for places all traffic control for this event and closing all roadways excluding Division St. All roadways North of Forster St will reopen as soon as the last runner has cleared that street. Roadways South of Forster St. will reopen following the parade. Traffic Engineering will remove the traffic control equipment and reopen the roadways.

Please follow and like us:

There are no comments yet.

Leave a Reply

Your email address will not be published. Required fields are marked (*).